Manufacturing, Sales, Project Design, Installation, Maintenance and repairs Call Us Today on 01322 357 080

Loading Zoom, please wait

Compli 1500 / 2500

The units compli 1500 and 2500 have been designed for the disposal of sewage from industrial, public and semi-public buildings, apartment blocks, flats, etc. for an uncontrolled effluent flow and specially where a safety factor must be provided. The entire unit is damp- and flood proof and thus ideally suited to placing in unventilated areas or basements subject to accidental flooding. 

 

The control panel must be installed in a dry, ventilated position safe from flooding. Maintenance is extremely simple; the tank has 2 top mounted inspection/cleaning apertures and, if necessary, the pumps can be removed/replaced in minutes and without disturbing the tank assembly.

Downloads

Info

Max Head:22.5m
Max Flow Rate:28 l/s
Max Solids Handling:100mm
Discharge Size:3" or 4"
Power Supply:415 volt
Feature 1:Large storage capacity
Feature 2:Polyehtelene tank
Feature 3:Selectable inlet position
Technical Datasheet:http://www.pts-jung.co.uk/images/technical-literature/033%20Compli%201500-2500.pdf
Operating Manual:http://www.pts-jung.co.uk/images/O&M%20August%202016/Compli%201500%20-%202500.pdf

Features