Festive Season Closure Notice Please note that Pump Technical Services Limited will be closed for the Christmas holidays, with our last working day Friday 19th December . Normal operations will… Read more about PTS Christmas Clo...


The flushing tube is made of stainless steel and is fitted to the vent opening of the pump. As soon as the level control gives the signal to the pump to start up, the flushing pipe provides a continuous stream of flushing water onto the liquid surface. By this means the formation of a floating crust is prevented and deposits cannot form.
|